39TH ST (PERSHING) over RACINE AVE & RR
1.3 W I-94 · County 031, Illinois · Built 1936 · 4 Lanes · 15,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
2
Critical
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 2 | Critical |
| Substructure | 3 | Serious |
Location
41.823322, -87.655981
This bridge is in worse condition than 99% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 90 years old.
Nearby Bridges
35TH ST over S FK S BR CHI RIVER
Built 1969
ARCHER AVE over S FK S BR CHI RIVER
Built 1963
I- 55 EB ELEVATED over S BR CHICAGO RIVER
Built 1963
I- 55 WB ELEVATED over S BR CHICAGO RIVER
Built 1963
I- 55 WB STEVENSON over LOCK ST
Built 1963
I- 55 EB STEVENSON over LOCK ST
Built 1963
39TH ST (PERSHING) over I- 90 94 DAN RYAN
Built 1962
I- 90 94 DAN RYAN over SANITARY SEWER
Built 1961
I- 55 EB STEVENSON over LOOMIS & FULLER STS
Built 1964
I- 55 WB STEVENSON over LOOMIS & FULLER STS
Built 1964
Bridge Details
- Structure #
- 016039600000000
- Year Built
- 1936
- Reconstructed
- 1979
- Length
- 198.8 m (652.2 ft)
- Max Span
- 32.6 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 4
- Daily Traffic
- 15,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,633,000
- Total Project Cost
- $6,950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.