JOHN ST (FAU 7128) over COPPER SLOUGH
.25 MI W DUNCAN RD · County 019, Illinois · Built 1967 · 2 Lanes · 2,200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
40.109358, -88.296631
This bridge is in worse condition than 97.8% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 59 years old.
Nearby Bridges
FAU 7155(DUNCAN RD over COPPER SLOUGH
Built 1976
WILLIAM ST over COPPER SLOUGH
Built 1966
IL 10(FAU 7123) over COPPER SLOUGH
Built 1983
FAP 801 (IL 10) over COPPER SLOUGH
Built 2023
I-57(NB) over CN Railway & IL 10
Built 1964
I-57(SB) over CN Railway & IL 10
Built 1964
DUNCAN RD(FAU 7155 over FAP 725
Built 1966
FAP 725 over COPPER SLOUGH
Built 1965
FAP 725(EB) over Canadian National Railwa
Built 1966
FAP 725 (WB) over CN Railwy & Copper Sloug
Built 1966
Bridge Details
- Structure #
- 010620300000000
- Year Built
- 1967
- Reconstructed
- 2004
- Length
- 22.2 m (72.8 ft)
- Max Span
- 7.1 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,200
- Material
- Concrete
- Design
- Channel Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.