FAP 801 (IL 10) over COPPER SLOUGH

W. EDGE OF CHAMPAIGN · County 019, Illinois · Built 2023 · 2 Lanes · 12,100 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
010203800000000
Year Built
2023
Length
7.6 m (24.9 ft)
Max Span
3.6 m
Lanes
2
Daily Traffic
12,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.