DUNCAN RD(FAU 7155 over FAP 725
W OF CHAMPAIGN · County 019, Illinois · Built 1966 · 2 Lanes · 7,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.120017, -88.295539
This bridge is in worse condition than 18.3% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
FAP 725 over COPPER SLOUGH
Built 1965
FAP 725(EB) over Canadian National Railwa
Built 1966
FAP 725 (WB) over CN Railwy & Copper Sloug
Built 1966
FAP 725 (EB) over COPPER SLOUGH
Built 1966
IL 10(FAU 7123) over COPPER SLOUGH
Built 1983
I-72(WB) over I-57
Built 1965
I-72(EB) over I-57
Built 1965
FAP 801 (IL 10) over COPPER SLOUGH
Built 2023
I-57 over COPPER SLOUGH
Built 1965
FAU 7155(DUNCAN RD over COPPER SLOUGH
Built 1976
Bridge Details
- Structure #
- 010017000000000
- Year Built
- 1966
- Reconstructed
- 2001
- Length
- 67.5 m (221.5 ft)
- Max Span
- 20.5 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 7,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $862,000
- Total Project Cost
- $1,293,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.