FAP 725 (WB) over CN Railwy & Copper Sloug
W OF CHAMPAIGN · County 019, Illinois · Built 1966 · 2 Lanes · 10,450 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
40.118161, -88.287619
This bridge is in worse condition than 92.4% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
FAP 725(EB) over Canadian National Railwa
Built 1966
FAP 725 (EB) over COPPER SLOUGH
Built 1966
FAP 801 (IL 10) over COPPER SLOUGH
Built 2023
DUNCAN RD(FAU 7155 over FAP 725
Built 1966
IL 10(FAU 7123) over COPPER SLOUGH
Built 1983
FAU 7155(DUNCAN RD over COPPER SLOUGH
Built 1976
FAP 725 over COPPER SLOUGH
Built 1965
FAU 7110(BRADLEY A over STREAM
Built 1972
JOHN ST (FAU 7128) over COPPER SLOUGH
Built 1967
I-72(WB) over I-57
Built 1965
Bridge Details
- Structure #
- 010003700000000
- Year Built
- 1966
- Length
- 76.9 m (252.3 ft)
- Max Span
- 23 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 10,450
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.