FAU 7158(MATTIS AV over FAI 74
2.5 MI NW CHAMPAIGN · County 019, Illinois · Built 2020 · 4 Lanes · 16,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.141025, -88.277306
This bridge is in worse condition than 18.3% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 6 years old.
Nearby Bridges
FAI 74 & Ramp G over COPPER SLOUGH
Built 2023
FAP 719 (US 150) over COPPER SLOUGH
Built 1964
Ramp G over Ramp F
Built 2024
FAI 57 Ramps H D & over COPPER SLOUGH
Built 2023
I-74(WB) over I-57
Built 1965
I-74(EB) over I-57
Built 1965
FAP 719 (US 150) over FAI 57
Built 2021
FAU 7158 (MATTIS A over FAI 57
Built 2020
FAU 7110(BRADLEY A over STREAM
Built 1972
FAU7197FAP804(PROS over I-74
Built 1957
Bridge Details
- Structure #
- 010127000000000
- Year Built
- 2020
- Length
- 98.2 m (322.2 ft)
- Max Span
- 52.6 m
- Width
- 25.6 m (84 ft)
- Lanes
- 4
- Daily Traffic
- 16,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.