FAU7197FAP804(PROS over I-74
CHAMPAIGN · County 019, Illinois · Built 1957 · 6 Lanes
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.134936, -88.258086
This bridge is in worse condition than 64.1% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 69 years old.
Nearby Bridges
NEIL ST(FAU 7166) over I-74
Built 1956
I-74 over MARKET ST(FAU 7169)
Built 1957
FAU 7158(MATTIS AV over FAI 74
Built 2020
FAI 74 & Ramp G over COPPER SLOUGH
Built 2023
FAP 719 (US 150) over COPPER SLOUGH
Built 1964
Ramp G over Ramp F
Built 2024
FAU 7110(BRADLEY A over STREAM
Built 1972
I-74 over CN Railwy & TR 158/Oak S
Built 1956
FAI 57 Ramps H D & over COPPER SLOUGH
Built 2023
FAU 7158 (MATTIS A over FAI 57
Built 2020
Bridge Details
- Structure #
- 010018600000000
- Year Built
- 1957
- Reconstructed
- 1992
- Length
- 58 m (190.3 ft)
- Max Span
- 15.8 m
- Width
- 25.5 m (83.7 ft)
- Lanes
- 6
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.