FAI 74 & Ramp G over COPPER SLOUGH
NORTHWEST OF CHAMPAIGN · County 019, Illinois · Built 2023 · 7 Lanes · 31,500 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
40.142036, -88.279094
This bridge is in worse condition than 12.4% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 3 years old.
Nearby Bridges
FAU 7158(MATTIS AV over FAI 74
Built 2020
FAP 719 (US 150) over COPPER SLOUGH
Built 1964
Ramp G over Ramp F
Built 2024
I-74(EB) over I-57
Built 1965
I-74(WB) over I-57
Built 1965
FAI 57 Ramps H D & over COPPER SLOUGH
Built 2023
FAP 719 (US 150) over FAI 57
Built 2021
FAU 7158 (MATTIS A over FAI 57
Built 2020
FAU 7110(BRADLEY A over STREAM
Built 1972
FAP 813 over I-57
Built 1988
Bridge Details
- Structure #
- 010204300000000
- Year Built
- 2023
- Length
- 10.9 m (35.8 ft)
- Max Span
- 3.2 m
- Lanes
- 7
- Daily Traffic
- 31,500
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.