FAI 57 Ramps H D & over COPPER SLOUGH
0.2 MI. N. OF FAI 74 · County 019, Illinois · Built 2023 · 8 Lanes · 23,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.147739, -88.281772
This bridge is in worse condition than 18.3% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 3 years old.
Nearby Bridges
I-74(WB) over I-57
Built 1965
I-74(EB) over I-57
Built 1965
Ramp G over Ramp F
Built 2024
FAU 7158 (MATTIS A over FAI 57
Built 2020
FAI 74 & Ramp G over COPPER SLOUGH
Built 2023
FAP 719 (US 150) over FAI 57
Built 2021
FAU 7158(MATTIS AV over FAI 74
Built 2020
FAP 719 (US 150) over COPPER SLOUGH
Built 1964
FAP 813 over I-57
Built 1988
DUNCAN RD over I-74
Built 1966
Bridge Details
- Structure #
- 010204400000000
- Year Built
- 2023
- Length
- 8.2 m (26.9 ft)
- Max Span
- 3.7 m
- Lanes
- 8
- Daily Traffic
- 23,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.