MULE SHOE MINE RD over SALMON RIVER;SE.CLAYTON

0.3 S. 0.9 E. CLAYTON · County 037, Idaho · Built 1930 · 1 Lanes · 60 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000031650
Year Built
1930
Length
46.3 m (151.9 ft)
Max Span
45.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
60
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$901,000
Total Project Cost
$1,351,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.