EAST FORK RD over E.FK.SALMON RIVER

2.4 S. 5.6 E. CLAYTON · County 037, Idaho · Built 1970 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031750
Year Built
1970
Length
15.8 m (51.8 ft)
Max Span
15.5 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$366,000
Total Project Cost
$549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.