EAST FORK RD over E.FK.SALMON RIVER

5.4 S. 5.7 E. CLAYTON · County 037, Idaho · Built 1972 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031770
Year Built
1972
Length
19.5 m (64 ft)
Max Span
19.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$436,000
Total Project Cost
$654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.