SQUAW CREEK ROAD over SQUAW CREEK
1.5 N. 3.4 W. CLAYTON · County 037, Idaho · Built 1960 · 2 Lanes · 330 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
44.290444, -114.471758
This bridge is in worse condition than 88.9% of bridges in County 037. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
SQUAW CREEK RD over SQUAW CREEK
Built 1960
SQUAW CREEK RD over SQUAW CREEK
Built 1960
SQUAW CREEK RD over SQUAW CREEK
Built 1960
THOMPSON CR ROAD over THOMPSON CREEK
Built 1982
SH 75 over SALMON RIVER; W. CLAYTON
Built 2008
SQUAW CREEK RD over SALMON RIVER;SW.CLAYTON
Built 1970
SQ___ CREEK ROAD over PAASASIKWANA NAOKWAIDE
Built 1964
SH 75 over SALMON RIVER;SLATE CR BR
Built 2011
SQ___ CREEK ROAD over PAASASIKWANA NAOKWAIDE
Built 1964
MULE SHOE MINE RD over SALMON RIVER;SE.CLAYTON
Built 1930
Bridge Details
- Structure #
- 000000000031730
- Year Built
- 1960
- Reconstructed
- 1984
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 330
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $149,000
- Total Project Cost
- $223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.