FIFTH STREET over S.FK.COEUR DALENE RIVER
IN MULLAN;FIFTH STREET · County 079, Idaho · Built 1972 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
47.470331, -115.796778
This bridge is in worse condition than 96.9% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 1963
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
I 90 EBL & WBL over COPPER STREET GS
Built 1973
THIRD STREET over S.FK.COEUR DALENE RIVER
Built 1978
THIRD STREET over I 90 EB-WB;THIRD ST.GS
Built 1973
I 90 EBL & WBL over I 90 EB OFF;W.MULLAN IC
Built 1973
I 90B LOOP over I 90 EB-WB;E.MULLAN IC
Built 1973
I 90RAMP WB 2WAY over S.FK.CDA RIVER
Built 1964
MILL ROAD over I 90;MILL ROAD IC
Built 1963
Bridge Details
- Structure #
- 000000000030735
- Year Built
- 1972
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $388,000
- Total Project Cost
- $582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.