I 90B LOOP over S.FK.COEUR DALENE RIVER
IN MULLAN · County 079, Idaho · Built 1963 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.468875, -115.795536
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
I 90 EBL & WBL over COPPER STREET GS
Built 1973
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
FIFTH STREET over S.FK.COEUR DALENE RIVER
Built 1972
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
THIRD STREET over S.FK.COEUR DALENE RIVER
Built 1978
THIRD STREET over I 90 EB-WB;THIRD ST.GS
Built 1973
I 90 EBL & WBL over I 90 EB OFF;W.MULLAN IC
Built 1973
I 90B LOOP over I 90 EB-WB;E.MULLAN IC
Built 1973
I 90RAMP WB 2WAY over S.FK.CDA RIVER
Built 1964
MILL ROAD over I 90;MILL ROAD IC
Built 1963
Bridge Details
- Structure #
- 000000000017370
- Year Built
- 1963
- Length
- 14 m (45.9 ft)
- Max Span
- 14 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $570,000
- Total Project Cost
- $855,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.