I 90B LOOP over S.FK.COEUR DALENE RIVER

IN MULLAN · County 079, Idaho · Built 2014 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000017376
Year Built
2014
Length
14.9 m (48.9 ft)
Max Span
14 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.