THIRD STREET over S.FK.COEUR DALENE RIVER

IN MULLAN:3RD STREET · County 079, Idaho · Built 1978 · 2 Lanes · 360 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
000000000030655
Year Built
1978
Length
9.8 m (32.2 ft)
Max Span
8.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
360
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$599,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.