STC 7859;ROBINSON over I 84; ROBINSON RD GS
1.5 E. NAMPA ECL · County 027, Idaho · Built 2009 · 2 Lanes · 8,600 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.598917, -116.493556
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 17 years old.
Nearby Bridges
I 84B NBL over I 84B EB-WB;BURLEY IC
Built 1961
I 84B SBL over I 84B EB-WB;BURLEY IC
Built 1961
I 84 WBL & EBL over I 84B ;GARRITY BLVD IC
Built 2011
STC 7483;MCDERMOTT over RIDENBAUGH CANAL
Built 1969
SMA8513;ID CNTR RD over PHYLLIS CANAL
Built 1987
BIRCH LANE over PHYLLIS CANAL
Built 2000
SMA 8523;CHERRY LN over PHYLLIS CANAL
Built 1976
SMA8443;VICTORY RD over RIDENBAUGH CANAL
Built 1980
N. KNECKINGER AVE over TEN MILE CREEK
Built 2024
SMA 8683;BLACK CAT over I 84; BLACK CAT RD GS
Built 2009
Bridge Details
- Structure #
- 000000000027646
- Year Built
- 2009
- Length
- 59.7 m (195.9 ft)
- Max Span
- 29.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.