I 84B SBL over I 84B EB-WB;BURLEY IC
2.1 N. BURLEY · County 067, Idaho · Built 1961 · 2 Lanes · 6,250 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.599147, -116.514
This bridge is in worse condition than 79.1% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 65 years old.
Nearby Bridges
I 84 WBL & EBL over I 84B ;GARRITY BLVD IC
Built 2011
I 84B NBL over I 84B EB-WB;BURLEY IC
Built 1961
BIRCH LANE over PHYLLIS CANAL
Built 2000
STC 7859;ROBINSON over I 84; ROBINSON RD GS
Built 2009
SMA8513;ID CNTR RD over PHYLLIS CANAL
Built 1987
STC 8433;11TH AVE over PHYLLIS CNL;11TH AVE EXT
Built 1994
STC 8433; 11TH AVE over I 84;11TH AVE N. GS
Built 2010
SMA 8523;CHERRY LN over PHYLLIS CANAL
Built 1976
I 84 WBL over UPRR
Built 2011
I 84 EBL over UPRR
Built 2011
Bridge Details
- Structure #
- 000000000013335
- Year Built
- 1961
- Reconstructed
- 1979
- Length
- 78.9 m (258.9 ft)
- Max Span
- 21.3 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,304,000
- Total Project Cost
- $3,456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.