SMA8513;ID CNTR RD over PHYLLIS CANAL

2.5 N. 2.4 E. NAMPA · County 027, Idaho · Built 1987 · 5 Lanes · 26,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000026945
Year Built
1987
Reconstructed
2005
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
30.7 m (100.7 ft)
Lanes
5
Daily Traffic
26,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$501,000
Total Project Cost
$752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.