N. KNECKINGER AVE over TEN MILE CREEK
NAMPA NE CITY LIMITS · County 027, Idaho · Built 2024 · 2 Lanes · 100 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.623167, -116.507306
This bridge is in worse condition than 3.4% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 2 years old.
Nearby Bridges
E LEKEITIO VILL DR over PHYLLIS CANAL
Built 2024
SMA 8523;CHERRY LN over PHYLLIS CANAL
Built 1976
SMA8513;ID CNTR RD over PHYLLIS CANAL
Built 1987
STC 3799;USTICK RD over PHYLLIS CANAL
Built 1965
BIRCH LANE over PHYLLIS CANAL
Built 2000
STC 3770;STAR RD over FIVEMILE CREEK FEEDER
Built 2024
STC 8433;11TH AVE over PHYLLIS CNL;11TH AVE EXT
Built 1994
STC 3770;STAR RD over FIVEMILE CREEK
Built 2024
I 84B NBL over I 84B EB-WB;BURLEY IC
Built 1961
I 84B SBL over I 84B EB-WB;BURLEY IC
Built 1961
Bridge Details
- Structure #
- 000000000034270
- Year Built
- 2024
- Length
- 16.5 m (54.1 ft)
- Max Span
- 15.6 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.