STC 3851;HEXON RD over BOISE RIVER
0.4 S. 1.2 W. PARMA · County 027, Idaho · Built 1954 · 2 Lanes · 560 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 2 | Critical |
Location
43.781375, -116.972633
This bridge is in worse condition than 99.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 72 years old.
Nearby Bridges
STC 3851;HEXON RD over MCCONNELL ISLAND DITCH
Built 1993
SHARP LANE over SAND RUN GULCH
Built 1975
STC3742;WAMSTAD RD over BOISE RIVER
Built 1975
SAND ROAD over SAND RUN GULCH
Built 1969
ROSWELL ROAD over RIVERSIDE CANAL
Built 1985
SAND ROAD over SAND RUN GULCH
Built 1967
US 95 over FARMERS COOP CANAL
Built 1992
STEPHEN LANE over RIVERSIDE CANAL
Built 1983
BURDEN ROAD over FARMERS COOP SEBREE CNL
Built 1977
PEBBLE LANE over RIVERSIDE CANAL
Built 1977
Bridge Details
- Structure #
- 000000000027415
- Year Built
- 1954
- Reconstructed
- 2017
- Length
- 100.9 m (331 ft)
- Max Span
- 9.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 560
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $1,812,000
- Total Project Cost
- $2,718,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.