SHARP LANE over SAND RUN GULCH
0.8 N. 1.4 W. PARMA · County 027, Idaho · Built 1975 · 2 Lanes · 40 vehicles/day
Overall
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.799497, -116.975822
This bridge is in worse condition than 79.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 51 years old.
Nearby Bridges
STC 3851;HEXON RD over BOISE RIVER
Built 1954
STC 3851;HEXON RD over MCCONNELL ISLAND DITCH
Built 1993
US 95 over FARMERS COOP CANAL
Built 1992
STC3742;WAMSTAD RD over BOISE RIVER
Built 1975
SAND ROAD over SAND RUN GULCH
Built 1969
OLD FORT BOISE RD. over D LINE CANAL
Built 1984
PARMA ROAD over D LINE CANAL
Built 1971
BURDEN ROAD over FARMERS COOP SEBREE CNL
Built 1977
STC3738;SHELTON RD over FARMERS COOP SEBREE CNL
Built 1975
SAND ROAD over SAND RUN GULCH
Built 1967
Bridge Details
- Structure #
- 000000000026770
- Year Built
- 1975
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $203,000
- Total Project Cost
- $305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.