BURDEN ROAD over FARMERS COOP SEBREE CNL
0.8 N. 1.4 E. PARMA · County 027, Idaho · Built 1977 · 2 Lanes · 360 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.799475, -116.920211
This bridge is in worse condition than 79.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
STC3738;SHELTON RD over FARMERS COOP SEBREE CNL
Built 1975
STC 3896;WALKER RD over FARMERS COOP SEBREE CNL
Built 1969
SABIN ROAD over FARMERS COOP SEBREE CNL
Built 1985
OLD FORT BOISE RD. over D LINE CANAL
Built 1984
PARMA ROAD over D LINE CANAL
Built 1971
SAND ROAD over SAND RUN GULCH
Built 1969
US 95 over FARMERS COOP CANAL
Built 1992
SAND ROAD over SAND RUN GULCH
Built 1967
US 95 over US20;UPRR;US 20-95 IC
Built 2017
GOTSCH ROAD over D LINE CANAL
Built 1974
Bridge Details
- Structure #
- 000000000027015
- Year Built
- 1977
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.2 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 360
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $238,000
- Total Project Cost
- $357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.