STC3738;SHELTON RD over FARMERS COOP SEBREE CNL

0.6 N. 1.8 E. PARMA · County 027, Idaho · Built 1975 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000027065
Year Built
1975
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
420
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$264,000
Total Project Cost
$396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.