STEPHEN LANE over RIVERSIDE CANAL

3.2 S. 0.7 W. PARMA · County 027, Idaho · Built 1983 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027360
Year Built
1983
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$354,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.