2000 EAST ROAD over HIGH LINE CANAL
3.4S 2.0W FILER;JRDN COR · County 083, Idaho · Built 1965 · 2 Lanes · 400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.513739, -114.653067
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
2100 EAST RD over HIGH LINE CANAL
Built 1962
1900 EAST ROAD over HIGH LINE CANAL
Built 1964
2200 EAST RD over HIGH LINE CANAL
Built 1968
2100 EAST RD over LOW LINE CANAL
Built 1968
2000 EAST ROAD over LOW LINE CANAL
Built 1965
3600 NORTH ROAD over HIGH LINE CANAL
Built 1936
1900 EAST ROAD over LOW LINE CANAL
Built 1953
STC2721;2200 E. RD over LOW LINE CANAL
Built 1964
3800 NORTH RD over LOW LINE CANAL
Built 1973
STC2721;2200 E. RD over CEDAR DRAW
Built 1964
Bridge Details
- Structure #
- 000000000025560
- Year Built
- 1965
- Length
- 14.3 m (46.9 ft)
- Max Span
- 13.7 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $398,000
- Total Project Cost
- $597,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.