3800 NORTH RD over LOW LINE CANAL
1.0S 3.2W FILER;JRDN COR · County 083, Idaho · Built 1973 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.549425, -114.678008
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
1900 EAST ROAD over LOW LINE CANAL
Built 1953
N 1800 E ROAD over LOW LINE CANAL
Built 2011
2000 EAST ROAD over LOW LINE CANAL
Built 1965
N 1700 E over LATERAL 17A
Built 1969
1900 EAST ROAD over HIGH LINE CANAL
Built 1964
1700 EAST RD over LOW LINE CANAL
Built 2003
2100 EAST RD over LOW LINE CANAL
Built 1968
3600 NORTH ROAD over HIGH LINE CANAL
Built 1936
2000 EAST ROAD over HIGH LINE CANAL
Built 1965
3950 NORTH RD over CEDAR DRAW
Built 1968
Bridge Details
- Structure #
- 000000000025650
- Year Built
- 1973
- Length
- 14.3 m (46.9 ft)
- Max Span
- 13.7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $314,000
- Total Project Cost
- $471,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.