2100 EAST RD over HIGH LINE CANAL
3.1S 1.0W FILER;JRDN COR · County 083, Idaho · Built 1962 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.519353, -114.633378
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
2200 EAST RD over HIGH LINE CANAL
Built 1968
2000 EAST ROAD over HIGH LINE CANAL
Built 1965
STC2721;2200 E. RD over LOW LINE CANAL
Built 1964
2100 EAST RD over LOW LINE CANAL
Built 1968
3600 NORTH RD over CEDAR DRAW
Built 1963
STC2721;2200 E. RD over CEDAR DRAW
Built 1964
1900 EAST ROAD over HIGH LINE CANAL
Built 1964
2300 EAST RD over HIGH LINE CANAL
Built 1963
3800 NORTH ROAD over CEDAR DRAW
Built 1968
2000 EAST ROAD over LOW LINE CANAL
Built 1965
Bridge Details
- Structure #
- 000000000025520
- Year Built
- 1962
- Length
- 14.3 m (46.9 ft)
- Max Span
- 13.7 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $323,000
- Total Project Cost
- $485,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.