3600 NORTH RD over CEDAR DRAW
3.0S 0.7E FILER;JRDN COR · County 083, Idaho · Built 1963 · 2 Lanes · 350 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.520308, -114.596225
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
2300 EAST RD over HIGH LINE CANAL
Built 1963
2200 EAST RD over HIGH LINE CANAL
Built 1968
2300 EAST RD over LOW LINE CANAL
Built 1963
US 93 over LOW LINE CANAL
Built 1994
STC2721;2200 E. RD over LOW LINE CANAL
Built 1964
STC2713;3700 N. RD over LOW LINE CANAL
Built 1953
STC2721;2200 E. RD over CEDAR DRAW
Built 1964
2100 EAST RD over HIGH LINE CANAL
Built 1962
2500 EAST ROAD over LOW LINE CANAL
Built 1930
2500 EAST ROAD over HIGH LINE CANAL
Built 1964
Bridge Details
- Structure #
- 000000000025415
- Year Built
- 1963
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $208,000
- Total Project Cost
- $312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.