2200 EAST RD over HIGH LINE CANAL

3.4 S. FILER;JORDON COR · County 083, Idaho · Built 1968 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000025410
Year Built
1968
Length
24.7 m (81 ft)
Max Span
12.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Channel Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$530,000
Total Project Cost
$794,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.