I 90 EBL & WBL over RR ROADBED/NO TRACKS
3.0 E. MULLAN · County 079, Idaho · Built 1972 · 4 Lanes · 9,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.463983, -115.7463
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
WILLOW CREEK RD over I 90 EB-WB;WILLOW CR. GS
Built 1973
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 1973
OLD HWY ROAD over S.FK.COEUR DALENE RIVER
Built 2014
I 90B LOOP over I 90 EB-WB;E.MULLAN IC
Built 1973
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
I 90 EBL & WBL over COPPER STREET GS
Built 1973
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 1963
FIFTH STREET over S.FK.COEUR DALENE RIVER
Built 1972
THIRD STREET over I 90 EB-WB;THIRD ST.GS
Built 1973
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 2014
Bridge Details
- Structure #
- 000000000017315
- Year Built
- 1972
- Length
- 78 m (255.9 ft)
- Max Span
- 30.5 m
- Width
- 24.9 m (81.7 ft)
- Lanes
- 4
- Daily Traffic
- 9,300
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,978,000
- Total Project Cost
- $5,967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.