ACCESS RD LOCK DAM over LOCK & DAM NEW SAV BLUFF
SOUTH SIDE AUGUSTA GA · County 245, Georgia · Built 1979 · 2 Lanes · 150 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.372389, -81.946069
This bridge is in worse condition than 96.2% of bridges in County 245. The average bridge in Georgia is 0 years old; this one is 47 years old.
Nearby Bridges
LOCK & DAM ROAD over BUTLER CREEK
Built 1996
DOUG BARNARD PARKW over BUTLER CREEK
Built 1980
GOSHEN ROAD over SPIRIT CREEK
Built 1980
I-520 (EBL) over PHINIZY DITCH
Built 1998
I-520 (EBL) over PHINIZY SWAMP OVERFLOW
Built 1998
I-520 (WBL) over PHINIZY DITCH
Built 1998
I-520 (WBL) over PHINIZY SWAMP OVERFLOW
Built 1998
I-520 (EBL) over ROCKY CREEK OVERFLOW
Built 1998
I-520 (WBL) over ROCKY CREEK OVERFLOW
Built 1998
DOUG BARNARD PKWY- over SR 415 (I-520)
Built 1996
Bridge Details
- Structure #
- CEPSASGALD00001
- Year Built
- 1979
- Length
- 35.3 m (115.8 ft)
- Max Span
- 8.8 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $515,000
- Total Project Cost
- $773,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.