DOUG BARNARD PARKW over BUTLER CREEK
8.5 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1980 · 4 Lanes · 11,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.389378, -81.974447
This bridge is in worse condition than 21.9% of bridges in County 245. The average bridge in Georgia is 0 years old; this one is 46 years old.
Nearby Bridges
LOCK & DAM ROAD over BUTLER CREEK
Built 1996
DOUG BARNARD PKWY- over SR 415 (I-520)
Built 1996
DOUG BARNARD PKWY- over SR 415 (I-520)
Built 1996
I-520 (EBL) over ROCKY CREEK OVERFLOW
Built 1998
I-520 (WBL) over ROCKY CREEK OVERFLOW
Built 1998
I-520 (EBL) over PHINIZY SWAMP OVERFLOW
Built 1998
I-520 (WBL) over PHINIZY SWAMP OVERFLOW
Built 1998
I-520 over NS RAILROAD
Built 1981
I-520 (EBL) over PHINIZY DITCH
Built 1998
I-520 (WBL) over PHINIZY DITCH
Built 1998
Bridge Details
- Structure #
- 000000024500350
- Year Built
- 1980
- Reconstructed
- 1993
- Length
- 48.8 m (160.1 ft)
- Max Span
- 12.2 m
- Width
- 28.1 m (92.2 ft)
- Lanes
- 4
- Daily Traffic
- 11,300
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $966,000
- Total Project Cost
- $1,449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.