DOUG BARNARD PARKW over BUTLER CREEK

8.5 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1980 · 4 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024500350
Year Built
1980
Reconstructed
1993
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
28.1 m (92.2 ft)
Lanes
4
Daily Traffic
11,300
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$966,000
Total Project Cost
$1,449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.