I-520 (WBL) over ROCKY CREEK OVERFLOW

9 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1998 · 3 Lanes · 80,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024550440
Year Built
1998
Length
57.9 m (190 ft)
Max Span
12.2 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
80,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$945,000
Total Project Cost
$1,417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.