I-75 over SWAMP CREEK

7.4 MI S OF DALTON · County 313, Georgia · Built 1961 · 6 Lanes · 78,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031300390
Year Built
1961
Reconstructed
1987
Length
61.3 m (201.1 ft)
Max Span
20.4 m
Width
42.5 m (139.4 ft)
Lanes
6
Daily Traffic
78,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,642,000
Total Project Cost
$2,463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.