CARBONDALE ROAD over I-75

8.3 MI S OF DALTON · County 313, Georgia · Built 2018 · 4 Lanes · 9,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031350960
Year Built
2018
Length
65.2 m (213.9 ft)
Max Span
32.6 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
9,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,018,000
Total Project Cost
$28,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.