US 41 over SWAMP CREEK

6.8 MI S OF DALTON · County 313, Georgia · Built 1949 · 2 Lanes · 8,410 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000031300050
Year Built
1949
Length
39.6 m (129.9 ft)
Max Span
7.9 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
8,410
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.