US 41/ SR 3 over CSX RAILROAD

3 MI S OF DALTON · County 313, Georgia · Built 1991 · 5 Lanes · 15,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031350710
Year Built
1991
Length
59.1 m (193.9 ft)
Max Span
21.6 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
15,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,378,000
Total Project Cost
$2,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.