CITY BOULEVARD over SATILLA RIVER TRIB

CITY OF WAYCROSS · County 299, Georgia · Built 1955 · 2 Lanes · 801 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029950840
Year Built
1955
Reconstructed
1998
Length
13.7 m (44.9 ft)
Max Span
4.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
801
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$176,000
Total Project Cost
$264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.