SR 38 - US 84 over SATILLIA RIVER OVERFLOW

2 MI E OF WAYCROSS · County 299, Georgia · Built 1923 · 4 Lanes · 21,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000029900120
Year Built
1923
Reconstructed
1982
Length
152.4 m (500 ft)
Max Span
7.6 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
21,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,019,000
Total Project Cost
$4,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.