SR 38 - US 84 over SATILLA RIVER TRIB.

CITY LIMITS OF WAYCROSS · County 299, Georgia · Built 1964 · 5 Lanes · 16,600 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000029900110
Year Built
1964
Length
6.7 m (22 ft)
Max Span
3.4 m
Lanes
5
Daily Traffic
16,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.