SR 520-US 82-COR Z over M-5201 HAINES AVENUE

CITY OF WAYCROSS · County 299, Georgia · Built 1981 · 4 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029900310
Year Built
1981
Length
30.8 m (101 ft)
Max Span
30.8 m
Width
16.9 m (55.4 ft)
Lanes
4
Daily Traffic
19,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$610,000
Total Project Cost
$915,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.