I-20 (WBL) over AUGUSTA CANAL
15.5 MI N OF HEPHZIBAH · County 245, Georgia · Built 2021 · 2 Lanes · 37,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.528439, -82.017928
This bridge is in worse condition than 21.9% of bridges in County 245. The average bridge in Georgia is 0 years old; this one is 5 years old.
Nearby Bridges
I-20 over SAVANNAH RIVER
Built 2021
I-20 over SAVANNAH RIVER
Built 2021
MURRAY ROAD over ROCK CREEK
Built 1990
I-20 over SR 104- CSX RAILROAD
Built 1964
MURRAY ROAD over CSX RAILROAD
Built 1990
MURRAY ROAD over AUGUSTA CANAL TRIB
Built 1990
SC 230 over POLE BRANCH
Built 1946
SC 230 over POLE BRANCH
Built 1946
SC 230 over I-20
Built 1966
I-20 RAMP over SR 28
Built 1981
Bridge Details
- Structure #
- 000000024551010
- Year Built
- 2021
- Length
- 117 m (383.9 ft)
- Max Span
- 48.8 m
- Width
- 19.2 m (63 ft)
- Lanes
- 2
- Daily Traffic
- 37,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $34,114,000
- Total Project Cost
- $51,171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.