I-20 over SAVANNAH RIVER

15.7 MI N OF HEPHZIBAH · County 245, Georgia · Built 2021 · 2 Lanes · 37,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000024551020
Year Built
2021
Length
389.5 m (1277.9 ft)
Max Span
43.3 m
Width
22.9 m (75.1 ft)
Lanes
2
Daily Traffic
37,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$113,516,000
Total Project Cost
$170,274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.