I-20 RAMP over SR 28

13.9 MI N OF HEPHZIBAH · County 245, Georgia · Built 1981 · 1 Lanes · 3,420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024500550
Year Built
1981
Length
55.5 m (182.1 ft)
Max Span
30.8 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
3,420
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$517,000
Total Project Cost
$776,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.