SCOTTS WAY over RAES CREEK

12.8 MI N OF HEPHZIBAH · County 245, Georgia · Built 2017 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000024550930
Year Built
2017
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,552,000
Total Project Cost
$5,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.