US 80 EBL over CR2262 MOON ROAD EXIT 5
NNE COLUMBUS · County 215, Georgia · Built 1988 · 2 Lanes · 41,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.551289, -84.935869
This bridge is in worse condition than 41.5% of bridges in County 215. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
US 80 WBL over CR 2262 MOON ROAD-EXIT 5
Built 1988
US 27 / SR 1 over SR 22- 2 SR 22 RAMPS
Built 1985
SR 22 RAMP over ROARING BRANCH TRIB
Built 1983
US 80 over ROARING BRANCH TRIB
Built 1983
SR 22R EBL- US 80 over I-185(SR411)-2 I-185 RMP
Built 1983
US 80 EBL/ SR 22 over I-185(SR411)-2 I-185 RMP
Built 1988
SR 22R WBL- US 80 over I-185(SR411)-2 I-185 RMP
Built 1983
US 80 WBL/ SR 22 over I-185(SR411)-2 I-185 RMP
Built 1988
I-185 over ROARING BRANCH
Built 1977
BELLANCA STREET over LINDSEY CREEK TRIB
Built 1995
Bridge Details
- Structure #
- 000000021501500
- Year Built
- 1988
- Length
- 53 m (173.9 ft)
- Max Span
- 28.7 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 41,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $680,000
- Total Project Cost
- $1,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.