US 80 EBL over CR2262 MOON ROAD EXIT 5

NNE COLUMBUS · County 215, Georgia · Built 1988 · 2 Lanes · 41,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501500
Year Built
1988
Length
53 m (173.9 ft)
Max Span
28.7 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
41,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$680,000
Total Project Cost
$1,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.