US 80 WBL over CR 2262 MOON ROAD-EXIT 5
NORTH-NE COLUMBUS · County 215, Georgia · Built 1988 · 2 Lanes · 3,870 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.553258, -84.926586
This bridge is in worse condition than 41.5% of bridges in County 215. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
US 80 EBL over CR2262 MOON ROAD EXIT 5
Built 1988
SCHOMBURG ROAD over SR 22 (US 80)
Built 1988
US 27 / SR 1 over SR 22- 2 SR 22 RAMPS
Built 1985
BLACKMON ROAD over SR 22 (US 80)(EXIT 6)
Built 1988
SR 22 RAMP over ROARING BRANCH TRIB
Built 1983
US 80 over ROARING BRANCH TRIB
Built 1983
WARM SPRINGS RD over COOPER CREEK
Built 1930
WARM SPRINGS RD over COOPER BRANCH
Built 1983
BELLANCA STREET over LINDSEY CREEK TRIB
Built 1995
CUNNINGHAM DRIVE over COOPER CREEK
Built 1955
Bridge Details
- Structure #
- 000000021501510
- Year Built
- 1988
- Length
- 53 m (173.9 ft)
- Max Span
- 28.7 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,870
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $680,000
- Total Project Cost
- $1,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.