PSALMOND ROAD over SR 85 (US 27 ALT) 11.53N

NORTHEAST COLUMBUS · County 215, Georgia · Built 1961 · 2 Lanes · 1,820 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000021500250
Year Built
1961
Length
80.5 m (264.1 ft)
Max Span
21 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,820
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,032,000
Total Project Cost
$1,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.