PSALMOND ROAD over SR 85 (US 27 ALT) 11.53N
NORTHEAST COLUMBUS · County 215, Georgia · Built 1961 · 2 Lanes · 1,820 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.552178, -84.858522
This bridge is in worse condition than 81.1% of bridges in County 215. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
US 27 ALT. over BULL CREEK
Built 1961
BEAVER TRAIL RD. over BEAVER CREEK
Built 2003
PIERCE CHAPEL RD over FLATROCK BRANCH
Built 1930
US 80 EBL SR 22 over PED. WALKWAY
Built 1988
US 80 SR 22 WB-JR over PED. WALKWAY
Built 1988
WARM SPRINGS RD over BULL CREEK
Built 1977
US 80 EBL over M-8057 WARM SPRINGS RD
Built 1988
US 80 WBL over M-8057 WARM SPRINGS RD
Built 1988
US 80 over BULL CREEK
Built 1992
US 80 SR 22 over SR 85 (US 27 ALT)@10.70N
Built 1988
Bridge Details
- Structure #
- 000000021500250
- Year Built
- 1961
- Length
- 80.5 m (264.1 ft)
- Max Span
- 21 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,820
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,032,000
- Total Project Cost
- $1,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.